Smithbilt Homes

Nope

Hayden Farms

Available Floor Plan Series: Inspire, Imperial, Founders, Signature
Starting Price: $397,900

We are excited to bring our affordable homes to the Hardin Valley area in the Hayden Farms community. Construction is under way on the first 10 homes that are being offered at an “introduction price” that is VERY attractive. Don’t miss this opportunity to live in Hardin Valley at an affordable price.

View Available Inventory


Hardin Valley, here we come!

Additional Information

Amenities:
Playground, Pavilion, Streetlights, Sidewalks

Near By:
Shopping, Restaurants, Pellissippi

Homeowner's Association Info:
Hayden Farms HOA
(865) 694-6100
hoa@southlandco.com
Covenants and Restrictions

Utility Information

Water:
West Knox Utility
(865) 690-2521

Sewer:
West Knox Utility
(865) 690-2521

Electricity:
Lenior City Utility
(844) 687-5282

Gas:
Knoxville Utility Board
(865) 524-2911

Sales Information

Hayden Farms Team
haydenfarms@southlandrealtors.com

Schools

Elementary School:
Mill Creek
Middle School:
Hardin Valley Middle
High School:
Hardin Valley Academy


Hayden Farms On Instagram
94 Posts
1.6K Followers

Smithbilt Homes

Building homes of exceptional quality at an affordable price @smithbilthomes #smithbilthomes

Be sure to schedule your visit to explore our 5 Parade Homes during the upcoming second weekend of #paradeofhomes. Come and experience our most recent floorplan designs in our latest communities. Our Parade hours are from noon to 5pm on Friday, Saturday, and Sunday.

#knoxvilleparadeofhomes
#hbagkparadeofhomes

#thefarmatriverbendbysmithbilt
#thepreserveatoakridge
#honeyoaksbysmithbilt
#themeadowsatshannonvalleybysmithbilt
#haydenfarmsbysmithbilt
🏡🎉 Exciting News! It's that time of year again. The Parade of Homes starts this weekend! 
Smithbilt has 5 Parade Homes, each with its unique charm and style. Whether you're a homebuyer in today's market, or simply looking for in the future, you won't want to miss this year’s Parade. 

🗓️ When: Starting this Friday, Saturdays, and Sundays
🕛 Time: Noon to 5pm

See you there! 🏠❤️ #ParadeOfHomes Home Builders Association of Greater Knoxville National Association of Home Builders #ThePreserveAtOakRidge The Preserve at Oak Ridge #thefarmatriverbendbysmithbilt #honeyoaksbysmithbilt #haydenfarmsbysmithbilt #themeadowsatshannonvalley
Floor Plan Friday! 

This week we feature The Hamilton floor plan. Because of the open concept, the bonus room, the mud room and the laundry room, The Hamilton has quickly became a family favorite. The Hamilton is available in our newest Hardin Valley Community #haydenfarmsbysmithbilt as well as #emoryorchardbysmithbilt 

FYI: The Hamilton is also offered in a Craftsman Version in #farmatriverbendbysmithbilt 

3D Tour Available at https://smithbilthomes.com/smithbilt-floor-plans/founders-series/the-hamilton/


Interactive Sales Map
Hayden Farms 2
Lot 70 Lot 138 Lot 66 Lot 67 Lot 68 Lot 69 Lot 14 Lot 13 Lot 12 Lot 11 Lot 10 Lot 9 Lot 8 Lot 7 Lot 6 Lot 5 Lot 4 Lot 3 Lot 2 Lot 1 Lot 15 Lot 16 Lot 17 Lot 18 Lot 19 Lot 20 Lot 21 Lot 22 Lot 23 Lot 24 Lot 25 Lot 26 Lot 27 Lot 28 Lot 29 Lot 30 Lot 31 Lot 32 Lot 33 Lot 34 Lot 35 Lot 36 Lot 37 Lot 139 Lot 140 Lot 141 Lot 142 Lot 143 Lot 144 Lot 145 Lot 146 Lot 137 Lot 136 Lot 135 Lot 134 Lot 133 Lot 132 Lot 131 Lot 130 Lot 129 Lot 128 Lot 147 Lot 148 Lot 149 Lot 71 Lot 72 Lot 73 Lot 74 Lot 75 Lot 76 Lot 77 Lot 78 Lot 79 Lot 80 Lot 81 Lot 82 Lot 83 Lot 84 Lot 85 Lot 86 Lot 87 Lot 88 Lot 89 Lot 90 Lot 91 Lot 92 Lot 93 Lot 94 Lot 95 Lot 96 Lot 97 Lot 98 Lot 99 Lot 100 Lot 101 Lot 102 Lot 103 Lot 104 Lot 105 Lot 106 Lot 107 Lot 108 Lot 109 Lot 110 Lot 111 Lot 112 Lot 113 Lot 114 Lot 115 Lot 116 Lot 117 Lot 118 Lot 119 Lot 120 Lot 121 Lot 122 Lot 123 Lot 124 Lot 125 Lot 126 Lot 127 Lot 65 Lot 64 Lot 63 Lot 153 Lot 152 Lot 151 Lot 150 Lot 38 Lot 39 Lot 40 Lot 41 Lot 42 Lot 43 Lot 44 Lot 45 Lot 46 Lot 47 Lot 48 Lot 49 Lot 50 Lot 51 Lot 52 Lot 53 Lot 54 Lot 55 Lot 56 Lot 57 Lot 58 Lot 59 Lot 60 Lot 61 Lot 62

Lot 70

Lot 70

Status: SOLD

Floor Plan: Brenton

Completion Date: April 19, 2024

Lot 138

Lot 138

Status: SOLD

Floor Plan: Baldwin

Completion Date: June 23, 2023

Lot 66

Lot 66

Status: SOLD

Floor Plan: Manning

Completion Date: April 01, 2024

Lot 67

Lot 67

Status: SOLD

Floor Plan: Brenton

Completion Date: April 08, 2024

Lot 68

Lot 68

Status: SOLD

Floor Plan: Huntington

Completion Date: April 11, 2024

Lot 69

Lot 69

Status: SOLD

Floor Plan: Heyward

Completion Date: April 16, 2024

Lot 14

Lot 14

Status: SOLD

Floor Plan: Huntington

Completion Date: October 11, 2023

Lot 13

Lot 13

Status: SOLD

Floor Plan: Ellery

Completion Date: October 06, 2023

Lot 12

Lot 12

Status: SOLD

Floor Plan: Stockton

Completion Date: October 02, 2023

Lot 11

Lot 11

Status: SOLD

Floor Plan: Stratford

Completion Date: September 28, 2023

Lot 10

Lot 10

Status: SOLD

Floor Plan: Stockton

Completion Date: September 25, 2023

Lot 9

Lot 9

Status: SOLD

Floor Plan: Hamilton

Completion Date: September 20, 2023

Lot 8

Lot 8

Status: SOLD

Floor Plan: Lennon

Completion Date: September 11, 2023

Lot 7

Lot 7

Status: SOLD

Floor Plan: Stratford

Completion Date: September 06, 2023

Lot 6

Lot 6

Status: SOLD

Floor Plan: Hamilton

Completion Date: September 01, 2023

Lot 5

Lot 5

Status: SOLD

Floor Plan: Lennon

Completion Date: August 29, 2023

Lot 4

Lot 4

Status: SOLD

Floor Plan: Bainbridge

Completion Date: September 06, 2023

Lot 3

Lot 3

Status: SOLD

Floor Plan: Stockton

Completion Date: August 22, 2023

Lot 2

Lot 2

Status: SOLD

Floor Plan: Bristol

Completion Date: August 16, 2023

Lot 1

Lot 1

Status: SOLD

Floor Plan: Heyward

Completion Date: August 11, 2023

Lot 15

Lot 15

Status: MODEL

Floor Plan: Stockton (Model Home)

Lot 16

Lot 16

Status: SOLD

Floor Plan: Heyward

Completion Date: October 17, 2023

Lot 17

Lot 17

Status: SOLD

Floor Plan: Huntington

Completion Date: October 23, 2023

Lot 18

Lot 18

Status: SOLD

Floor Plan: Bristol

Completion Date: October 27, 2023

Lot 19

Lot 19

Status: SOLD

Floor Plan: Stockton

Completion Date: October 31, 2023

Lot 20

Lot 20

Status: SOLD

Floor Plan: Baldwin

Completion Date: November 03, 2023

Lot 21

Lot 21

Status: SOLD

Floor Plan: Stockton

Completion Date: November 08, 2023

Lot 22

Lot 22

Status: SOLD

Floor Plan: Stratford

Completion Date: November 14, 2023

Lot 23

Lot 23

Status: SOLD

Floor Plan: Hamilton

Completion Date: November 20, 2023

Lot 24

Lot 24

Status: SOLD

Floor Plan: Selestian

Completion Date: November 22, 2023

Lot 25

Lot 25

Status: SOLD

Floor Plan: Lennon

Completion Date: November 28, 2023

Lot 26

Lot 26

Status: SOLD

Floor Plan: Abigail

Completion Date: December 01, 2023

Lot 27

Lot 27

Status: SOLD

Floor Plan: Stockton

Completion Date: December 08, 2023

Lot 28

Lot 28

Status: SOLD

Floor Plan: Heyward

Completion Date: December 15, 2023

Lot 29

Lot 29

Status: SOLD

Floor Plan: Stratford

Completion Date: December 22, 2023

Lot 30

Lot 30

Status: SOLD

Floor Plan: Bristol

Completion Date: December 28, 2023

Lot 31

Lot 31

Status: SOLD

Floor Plan: Huntington

Completion Date: January 03, 2024

Lot 32

Lot 32

Status: SOLD

Floor Plan: Heyward

Completion Date: January 05, 2024

Lot 33

Lot 33

Status: SOLD

Floor Plan: Abigail

Completion Date: January 11, 2024

Lot 34

Lot 34

Status: SOLD

Floor Plan: Stratford

Completion Date: January 17, 2024

Lot 35

Lot 35

Status: SOLD

Floor Plan: Stockton

Completion Date: January 22, 2024

Lot 36

Lot 36

Status: Spec

Floor Plan: Winston

Lot 37

Lot 37

Status: Spec

Floor Plan: Hudson

Lot 139

Lot 139

Status: SOLD

Floor Plan: Tipton

Completion Date: December 25, 2024

Lot 140

Lot 140

Status: SOLD

Floor Plan: Hudson

Completion Date: January 26, 2024

Lot 141

Lot 141

Status: SOLD

Floor Plan: Winston

Completion Date: January 30, 2024

Lot 142

Lot 142

Status: SOLD

Floor Plan: Stratford

Completion Date: February 05, 2024

Lot 143

Lot 143

Status: SOLD

Floor Plan: Stockton

Completion Date: February 09, 2024

Lot 144

Lot 144

Status: SOLD

Floor Plan: Baldwin

Completion Date: February 14, 2024

Lot 145

Lot 145

Status: SOLD

Floor Plan: Ellery

Completion Date: February 23, 2024

Lot 146

Lot 146

Status: SOLD

Floor Plan: Huntington

Completion Date: March 01, 2024

Lot 137

Lot 137

Status: SOLD

Floor Plan: Stockton

Completion Date: June 28, 2023

Lot 136

Lot 136

Status: SOLD

Floor Plan: Franklin

Completion Date: July 07, 2023

Lot 135

Lot 135

Status: SOLD

Floor Plan: Hamilton

Completion Date: July 13, 2023

Lot 134

Lot 134

Status: SOLD

Floor Plan: Selestian

Completion Date: July 17, 2023

Lot 133

Lot 133

Status: SOLD

Floor Plan: Bristol

Completion Date: July 20, 2023

Lot 132

Lot 132

Status: SOLD

Floor Plan: Baldwin

Completion Date: July 24, 2023

Lot 131

Lot 131

Status: SOLD

Floor Plan: Lennon

Completion Date: July 28, 2023

Lot 130

Lot 130

Status: SOLD

Floor Plan: Heyward

Completion Date: August 01, 2023

Lot 129

Lot 129

Status: SOLD

Floor Plan: Stockton

Completion Date: August 07, 2023

Lot 128

Lot 128

Status: SOLD

Floor Plan: Ashford

Completion Date: April 23, 2024

Lot 147

Lot 147

Status: SOLD

Floor Plan: Bristol

Completion Date: March 08, 2024

Lot 148

Lot 148

Status: SOLD

Floor Plan: Baldwin

Completion Date: March 11, 2024

Lot 149

Lot 149

Status: SOLD

Floor Plan: Tipton

Completion Date: December 19, 2024

Lot 71

Lot 71

Status: SOLD

Floor Plan: Hudson

Completion Date: December 05, 2024

Lot 72

Lot 72

Status: SOLD

Floor Plan: Stratford

Completion Date: December 03, 2024

Lot 73

Lot 73

Status: SOLD

Floor Plan: Stockton

Completion Date: November 29, 2024

Lot 74

Lot 74

Status: SOLD

Floor Plan: Baldwin

Completion Date: November 27, 2024

Lot 75

Lot 75

Status: SOLD

Floor Plan: Bristol

Completion Date: November 25, 2024

Lot 76

Lot 76

Status: SOLD

Floor Plan: Huntington

Completion Date: November 21, 2024

Lot 77

Lot 77

Status: SOLD

Floor Plan: Ellery

Completion Date: November 19, 2024

Lot 78

Lot 78

Status: SOLD

Floor Plan: Bristol

Completion Date: November 13, 2024

Lot 79

Lot 79

Status: SOLD

Floor Plan: Stockton

Completion Date: November 11, 2024

Lot 80

Lot 80

Status: SOLD

Floor Plan: Heyward

Completion Date: November 07, 2024

Lot 81

Lot 81

Status: SOLD

Floor Plan: Winston

Completion Date: November 05, 2024

Lot 82

Lot 82

Status: SOLD

Floor Plan: Hudson

Completion Date: October 29, 2024

Lot 83

Lot 83

Status: SOLD

Floor Plan: Stratford

Completion Date: October 24, 2024

Lot 84

Lot 84

Status: SOLD

Floor Plan: Stockton

Completion Date: October 22, 2024

Lot 85

Lot 85

Status: SOLD

Floor Plan: Winston

Completion Date: October 18, 2024

Lot 86

Lot 86

Status: SOLD

Floor Plan: Abigail

Completion Date: October 15, 2024

Lot 87

Lot 87

Status: SOLD

Floor Plan: Walton

Completion Date: October 09, 2024

Lot 88

Lot 88

Status: SOLD

Floor Plan: Stratford

Completion Date: October 07, 2024

Lot 89

Lot 89

Status: SOLD

Floor Plan: Abigail

Completion Date: October 03, 2024

Lot 90

Lot 90

Status: SOLD

Floor Plan: Henley

Completion Date: October 01, 2024

Lot 91

Lot 91

Status: SOLD

Floor Plan: Stockton

Completion Date: September 27, 2024

Lot 92

Lot 92

Status: SOLD

Floor Plan: Heyward

Completion Date: September 25, 2024

Lot 93

Lot 93

Status: SOLD

Floor Plan: Bristol

Completion Date: September 19, 2024

Lot 94

Lot 94

Status: SOLD

Floor Plan: Stockton

Completion Date: September 16, 2024

Lot 95

Lot 95

Status: SOLD

Floor Plan: Abigail

Completion Date: September 10, 2024

Lot 96

Lot 96

Status: SOLD

Floor Plan: Winston

Completion Date: September 04, 2024

Lot 97

Lot 97

Status: SOLD

Floor Plan: Stockton

Completion Date: September 02, 2024

Lot 98

Lot 98

Status: SOLD

Floor Plan: Bristol

Completion Date: August 29, 2024

Lot 99

Lot 99

Status: SOLD

Floor Plan: Baldwin

Completion Date: August 27, 2024

Lot 100

Lot 100

Status: SOLD

Floor Plan: Hudson

Completion Date: August 23, 2024

Lot 101

Lot 101

Status: SOLD

Floor Plan: Abigail

Completion Date: August 21, 2024

Lot 102

Lot 102

Status: SOLD

Floor Plan: Hudson

Completion Date: August 16, 2024

Lot 103

Lot 103

Status: SOLD

Floor Plan: Abigail

Completion Date: August 12, 2024

Lot 104

Lot 104

Status: SOLD

Floor Plan: Winston

Completion Date: August 06, 2024

Lot 105

Lot 105

Status: SOLD

Floor Plan: Stratford

Completion Date: August 02, 2024

Lot 106

Lot 106

Status: SOLD

Floor Plan: Heyward

Completion Date: July 30, 2024

Lot 107

Lot 107

Status: SOLD

Floor Plan: Stockton

Completion Date: July 25, 2024

Lot 108

Lot 108

Status: SOLD

Floor Plan: Abigail

Completion Date: July 22, 2024

Lot 109

Lot 109

Status: SOLD

Floor Plan: Winston

Completion Date: July 17, 2024

Lot 110

Lot 110

Status: SOLD

Floor Plan: Heyward

Completion Date: July 15, 2024

Lot 111

Lot 111

Status: SOLD

Floor Plan: Abigail

Completion Date: July 10, 2024

Lot 112

Lot 112

Status: SOLD

Floor Plan: Heyward

Completion Date: July 05, 2024

Lot 113

Lot 113

Status: SOLD

Floor Plan: Stockton

Completion Date: July 01, 2024

Lot 114

Lot 114

Status: SOLD

Floor Plan: Stratford

Completion Date: June 26, 2024

Lot 115

Lot 115

Status: SOLD

Floor Plan: Abigail

Completion Date: June 19, 2024

Lot 116

Lot 116

Status: SOLD

Floor Plan: Stratford

Completion Date: June 13, 2024

Lot 117

Lot 117

Status: SOLD

Floor Plan: Winston

Completion Date: June 07, 2024

Lot 118

Lot 118

Status: SOLD

Floor Plan: Hudson

Completion Date: June 04, 2024

Lot 119

Lot 119

Status: SOLD

Floor Plan: Baldwin

Completion Date: May 30, 2024

Lot 120

Lot 120

Status: SOLD

Floor Plan: Winston

Completion Date: May 27, 2024

Lot 121

Lot 121

Status: SOLD

Floor Plan: Abigail

Completion Date: May 23, 2024

Lot 122

Lot 122

Status: SOLD

Floor Plan: Baldwin

Completion Date: May 21, 2024

Lot 123

Lot 123

Status: SOLD

Floor Plan: Bristol

Completion Date: May 17, 2024

Lot 124

Lot 124

Status: SOLD

Floor Plan: Winston

Completion Date: May 10, 2024

Lot 125

Lot 125

Status: SOLD

Floor Plan: Stratford

Completion Date: May 07, 2024

Lot 126

Lot 126

Status: SOLD

Floor Plan: Hudson

Completion Date: May 03, 2024

Lot 127

Lot 127

Status: SOLD

Floor Plan: Brighton

Completion Date: April 26, 2024

Lot 65

Lot 65

Status: SOLD

Floor Plan: Greendale

Completion Date: March 25, 2024

Lot 64

Lot 64

Status: SOLD

Floor Plan: Huntington

Completion Date: March 18, 2024

Lot 63

Lot 63

Status: SOLD

Floor Plan: Brenton

Completion Date: December 13, 2024

Lot 153

Lot 153

Status: SOLD

Floor Plan: Stratford

Completion Date: January 15, 2025

Lot 152

Lot 152

Status: SOLD

Floor Plan: Stockton

Completion Date: January 09, 2025

Lot 151

Lot 151

Status: Spec

Floor Plan: Hudson

Lot 150

Lot 150

Status: SOLD

Floor Plan: Stratford

Completion Date: January 03, 2025

Lot 38

Lot 38

Status: Spec

Floor Plan: Maybel

Lot 39

Lot 39

Status: Spec

Floor Plan: Winston

Lot 40

Lot 40

Status: SOLD

Floor Plan: Tipton

Completion Date: March 28, 2025

Lot 41

Lot 41

Status: Spec

Floor Plan: Abigail

Lot 42

Lot 42

Status: Spec

Floor Plan: Hudson

Lot 43

Lot 43

Status: Spec

Floor Plan: Abigail

Lot 44

Lot 44

Status: SOLD

Floor Plan: Heyward

Completion Date: April 14, 2025

Lot 45

Lot 45

Status: SOLD

Floor Plan: Baldwin

Completion Date: April 21, 2025

Lot 46

Lot 46

Status: Spec

Floor Plan: Tipton

Lot 47

Lot 47

Status: Spec

Floor Plan: Stockton

Lot 48

Lot 48

Status: Spec

Floor Plan: Hudson

Lot 49

Lot 49

Status: Spec

Floor Plan: Maybel

Lot 50

Lot 50

Status: SOLD

Floor Plan: Bristol

Completion Date: March 11, 2025

Lot 51

Lot 51

Status: SOLD

Floor Plan: Hudson

Completion Date: March 06, 2025

Lot 52

Lot 52

Status: Sold

Floor Plan: Stockton

Lot 53

Lot 53

Status: SOLD

Floor Plan: Heyward

Completion Date: February 26, 2025

Lot 54

Lot 54

Status: SOLD

Floor Plan: Huntington

Completion Date: February 21, 2025

Lot 55

Lot 55

Status: SOLD

Floor Plan: Stockton

Completion Date: February 18, 2025

Lot 56

Lot 56

Status: SOLD

Floor Plan: Walton

Completion Date: February 10, 2025

Lot 57

Lot 57

Status: SOLD

Floor Plan: Brenton

Completion Date: February 06, 2025

Lot 58

Lot 58

Status: SOLD

Floor Plan: Bristol

Completion Date: February 03, 2025

Lot 59

Lot 59

Status: Spec

Floor Plan: Huntington

Lot 60

Lot 60

Status: SOLD

Floor Plan: Brenton

Completion Date: January 27, 2025

Lot 61

Lot 61

Status: SOLD

Floor Plan: Huntington

Completion Date: January 23, 2025

Lot 62

Lot 62

Status: Spec

Floor Plan: Manning

Available  Sold  Spec  Unavailable  Reserved  Model  Amenities